Project Description
PEDELTA has been retained by SENER joining the design team to provide detailed structural design services. The new hospital building complex has an approximated extension of 38.000 square meters (410,000 sq ft). The new health care facility will be located within the existing Juan de Dios Hospital health Care Center in Bogotá and has been designed to provide health care services to a population of about 360.000 individuals.
Design/Construction Approach
The PEDELTA high rise building team in Bogotá together with the design team is developing reinforced concrete detailed structural design consisting of deep foundation system design, cast in place concrete elevation structures, and seismic analysis for a number of three separate buildings.
Key elements
Deep Foundation Systems, Health Care Facilities Design.