Project Description

A launch shaft was constructed for tunnel boring in 2015 as part of the Eglinton Crosstown Light-Rail Transit (LRT) in Toronto. The shaft is approximately 130 m long, with a variable width from 14 to 19 m. The excavation depth ranges from 9 to 13 m. Its shoring system includes secant pile walls with up to four levels of anchor tiebacks that support the shoring. Along the north wall the shoring retains Eglinton Avenue.

The ECLRT project requires the de-stressing of the existing anchor tiebacks of the temporary retaining walls prior to the construction of the inner underground tunnel structure. The Construction Joint Venture (CTSC) consisting of Aecon, SNC-Lavalin, Dragados and EllisDon, appointed Pedelta to provide a solution for the anchor tieback de-stressing and the demolition of the headwall shoring of the launch shaft.

Design/Construction Approach

Pedelta has overcome several challenges in the project to avoid interference with the construction of the new permanent structure that runs across the shaft by considering equipment capabilities that could be utilized in the project. Several construction approaches were assessed to determine the most efficient way to remove the tiebacks without affecting the construction of the internal structure and to maximize control of the wall deflection.

The selected tieback de-stressing procedure defines the build-back staging by using temporary bracing such as struts and rakers. To foresee and overcome the construction challenges two-dimensional structural dedicated analyses were performed for modeling the construction sequence and anchor de-stressing. A comprehensive monitoring plan was defined to track movements, tieback forces and deformations of the retaining walls during tieback de-stressing. The works were completed in spring of 2018.

Client
Crosslinx, JV of SNCL-Dragados-Aecon-EllisDon
Location
Toronto (Canada)
Key Elements
Support of Excavation, Tieback De-stressing

Services
Erection and Construction Engineering
Tieback De-stressing of East Portal Launch Shaft 3
Tieback De-stressing of East Portal Launch Shaft 3
Tieback De-stressing of East Portal Launch Shaft 3